Skip navigation menu
Melissa Hurtado for State Senate
  • ABC7

    New California law raises farmworker minimum wage to $19.75 an hour
  • PRESS RELEASE

    SJV WATER: Project to reduce groundwater pumping near Friant-Kern Canal – damaged by excessive...
  • sjv water

    Project to reduce groundwater pumping near Friant-Kern Canal – damaged by excessive pumping...
  • The porterville recorder

    Groundbreaking marks significant stage of Friant-Kern Canal repairs
  • ein presswire

    Hurtado Secures $150,000 For Public Safety Improvements in Lamont
  • valley voice

    Hurtado warns California can’t wait on airport infrastructure after Newsom veto
  • sierra sun times

    California State Senator Melissa Hurtado’s Legislation Signed Into Law, Tightening Firearm...
  • FOX26NEWS

    Sen. Melissa Hurtado presents $1 million for Kingsburg City Hall, emergency center
  • PRESS RELEASE

    California Police Chiefs Association Endorses
  • Sun-gazette

    Sen. Hurtado secures funds for safe water
  • KGET 17 News

    ‘The heart of California is right here’: Xavier Becerra stops in Bakersfield for Hurtado campaign...
  • KGET 17 News

    Kern County In Depth: Sept. 6, 2026
  • 23ABC News

    Xavier Becerra endorses state Sen. Melissa Hurtado for reelection in first Kern County visit
  • valley ag voice

    Becerra Backs Senator Hurtado at Bakersfield Campaign Kickoff
  • The Bakersfield Californian

    In Bakersfield, Becerra calls Central Valley heart of California
  • The Bakersfield Californian

    With Becerra's backing, Hurtado kicks off state Senate campaign
  • el popular

    Xavier Becerra en Bakersfield ayuda a lanzar la campaña de reelección de Sen. Melissa Hurtado
  • EIN Presswire

    Hurtado Taxpayer Protection Plan Secures Budget Reform, Delivers Millions Back to the Valley
  • KGET

    Sen. Melissa Hurtado urges Central Valley counties to coordinate cybersecurity efforts in new letter
  • the sun-gazette newspaper

    Hwy 99 Agri-Center Interchange Project complete
  • ain media group

    Aviation Coalition Supports California Fuel Tax Bill
  • Valley voice

    TCAG names Senator Hurtado as 2026 LocalMotion Elected Official of the Year
  • PRESS RELEASE

    Thank You Senate District 16!
  • PRESS RELEASE

    Senator Melissa Hurtado Draws Nearly 200 Supporters For Final Push Ahead of Tuesday's Election
  • Agri-Pulse

    Ag overtime tax credit returns as lawmakers seek relief for growers
  • NEWS ARTICLE

    State Senate Bill aims to boost farmworker pay and support agricultural employers
  • Fox 26 news

    Farmersville unveils new fire station with state funding boost
  • NEWS ARTICLE

    Kern County Board of Supervisors honors Sen. Melissa Hurtado for securing state funds
  • NEWS ARTICLE

    From Shafter to McFarland: New Investments in Public Safety
  • NEWS ARTICLE

    Central Valley lawmaker wants to make it easier to get help paying energy bills
  • 23 ABC News Bakersfield

    Hurtado’s ‘Common Sense Plan’ bills advance to California Assembly
  • 23 ABC News Bakersfield

    Sen. Hurtado promotes SB 661 at Meadows Field Airport
  • SJV Wire

    Hurtado's Bill Seeks More Funds to Protect South Valley From Floods
  • 23 ABC News Bakersfield

    Hurtado’s ‘Common Sense Plan’ bills advance to California Assembly
  • NEWS ARTICLE

    Bill aims to get a bigger slice of state funding to protect south San Joaquin Valley
  • NEWS ARTICLE

    Senator Hurtado introduces bill to tackle California's water crisis
  • NEWS ARTICLE

    Tulare County gets $1M for rural road repairs, check presented by State Sen. Melissa Hurtado

PRESS RELEASE

SJV WATER: Project to reduce groundwater pumping near Friant-Kern Canal – damaged by excessive...

... pumping – gets underway

By Lisa McEwen, SJV Water

A groundbreaking ceremony in southern Tulare County last week signaled the start of another chapter in the long and expensive effort to fix the sinking Friant-Kern Canal.

Subsidence due to excessive groundwater pumping caused a 33-mile section of the Friant-Kern Canal to sink.

Subsidence due to excessive groundwater pumping caused a 33-mile section of the Friant-Kern Canal to sink.

Construction began on five new Friant Water Authority pump stations that will lift water out of the canal and into Tea Pot Dome Water District and Saucelito Irrigation District systems, reducing growers’ reliance on groundwater. The project is expected to cost $46 million and take two and a half years to complete.

More than $500 million – so far – in local, state and federal funding has been dedicated to fixing the canal, which has sunk along a 33-mile section from about Pixley to the Kern County line due to excessive groundwater pumping. Friant is looking for up to $400 million more to start the next phase of construction.

It’s unknown yet exactly where that funding will come from.

“If the federal government helped build this critical piece of infrastructure, why should farmers alone be left to shoulder the entire burden of repairing the damage that threatens the system of such importance?” Friant Water Authority Executive Director Johnny Amaral asked during the groundbreaking.

Amaral’s statement hit on a politically sensitive question of public pay for private gain.

In fact, voters rejected Proposition 3 in 2018, which included $750 million to fix the Friant-Kern Canal, largely because many voters questioned why taxpayers should pay to fix infrastructure that was damaged by farmers.

Amaral acknowledged the controversy over how pumping has damaged the canal, itself a fraught issue in the Tule subbasin, where the state is readying its own mandatory pumping plan that would bar pumping within two miles of the Friant-Kern Canal.

“We have been facing a hard truth,” he said of subsidence damage to the canal and a slew of lawsuits that were recently settled.

“It’s not an abstract engineering problem, and it’s not a misunderstood problem. Frankly, it’s a problem that we’re still grappling with here on the east side. We definitely had debates and differences but that is gone now.”

L-R: Interim Regional Director of the Bureau of Reclamation Adam Nickles; State Sen. Melissa Hurtado; Congressman Vince Fong; Friant Water Authority President Rick Borges; Tea Pot Dome Water District President Matt Leider; Congressman David Valadao; Saucelito Irrigation District President Steven Kisling; Friant Water Authority Executive Director Johnny Amaral. Lisa McEwen / SJV Water

L-R: Interim Regional Director of the Bureau of Reclamation Adam Nickles; State Sen. Melissa Hurtado; Congressman Vince Fong; Friant Water Authority President Rick Borges; Tea Pot Dome Water District President Matt Leider; Congressman David Valadao; Saucelito Irrigation District President Steven Kisling; Friant Water Authority Executive Director Johnny Amaral. Lisa McEwen / SJV Water

Friant has so far spent $326 million to build a brand new 10-mile section of canal alongside the old canal, which had sunk so badly the canal’s carrying capacity was cut by 60%, meaning water contractors south of the crimp could not get their full deliveries.

Up until March, Friant was still figuring out a repayment plan for a portion of the federal dollars included in that $326 million.

Then the Department of the Interior announced the same month that Friant would receive $200 million for subsidence corrections from a larger water infrastructure fund for western states.

Friant is expecting to begin the second phase of its reconstruction plan on the remaining 23 miles of damaged canal as it cobbles together the necessary money.

Friant had sued a local groundwater agency after it said the agency reneged on an agreement to have its farmers pay a certain amount in pumping fees toward canal repairs. It then tried to increase fees on several of its own contractor water districts to make up the costs, incurring more lawsuits.

Those suits have all been settled.

As the groundbreaking played out on the first day of the 2026-2027 water year, onlookers were hopeful the new pump stations would allow full water deliveries, plus extra during high flow years needed to replenish overpumped aquifers.

That hasn’t been possible in recent years after land beneath the canal collapsed from over pumping.

Steve Kisling, farmer and president of Saucelito Irrigation District, told a crowd of growers, water managers and elected officials that current and future generations of farmers will benefit from this project.

“My father and grandfather both farmed before the (canal) was built,” he said. “And they routinely reminded me how important and how valuable the surface water project and delivery system is,” he said. “Now our surface water supply and delivery system is more important than ever.”

Saucelito will get four pumps while Tea Pot Dome gets one. Another eight stations are planned downstream, part of Phase 2 of Friant’s overall plan to address subsidence impacts.

Matt Leider, president of Tea Pot Dome Water District, said he was thankful Friant kept its promise to build the pump station, which was delayed due to funding constraints. The raft of lawsuits also sparked friction among Friant contractors, which played out in a tense board meeting last May.

Tea Pot Dome has a well near the canal that it uses to send water throughout its 3,400-acre district. The state Water Resources Control Board’s proposed pumping moratorium near the canal means the new pump station will bring much-needed surface water into the district.

“Since SGMA was enacted, we’ve always been trying to figure out a way to not use that well,” he said. “We don’t want to hurt the very canal that brings us our supplies.”

Meanwhile, Friant Water Authority is preparing to advance Phase 2A, which includes construction of approximately 2.7 miles of parallel canal from the Tule River to Avenue 136, where it will tie in to the origin of the Phase 1 parallel canal. Construction bids open Oct. 23.